In Staines-upon-Thames, the household bathroom is often one small room doing the work of two: steam that never clears, grout turning black at the corners, a bath that sees more showers than soaks. Bathroom Installation from Abinger Construction Ltd rebuilds that room from the floor up, with the layout, waterproofing and finish planned around how you actually use it.
The Essentials
We are a Surrey building company with bathrooms and wetrooms as our declared focus, so a family bathroom or a wetroom in Staines-upon-Thames is the work we are organised for. One project manager runs the job, and every installation carries a 10-year workmanship guarantee, subject to its terms.
Ask Abinger Construction Ltd for a free quote on your Staines-upon-Thames bathroom now, while the layout is still yours to rethink.

Take the panel off an old bath and you usually find the same picture. A compression joint weeping slowly. Chipboard gone soft around the waste. Pipework boxed in wherever it happened to land. In the flats and family houses of Staines-upon-Thames, the bathroom is often small, and the layout was fixed years ago by where the soil stack runs. So that is where our survey starts. We measure the room, find the stack, test the floor and trace how water comes in and goes out, all before anyone talks about tiles.
Some rooms need rethinking, not just refitting. For those we offer a paid Bathroom Concept and Layout Service, and the fee is fully deducted from the installation cost. You receive a measured layout plan, a 2D floor plan, 3D visual concept images and practical advice on layout and installation. It is a concept layout service rather than a full interior design specification. Your final product selections are made with your own supplier or showroom.
Plenty of people arrive with a layout agreed with their architect, designer or showroom. That suits us well. We work from those drawings and selections, then take responsibility for the build, the coordination and the finish. Plans first. Then the build.
Book a survey with Abinger Construction Ltd for your bathroom installation in Staines-upon-Thames and receive a written proposal breaking down costs, timelines and permits stage by stage.

A shower tray bedded on a timber floor flexes slightly every time someone steps in. Over a few years that movement splits the silicone and lets water reach the joists. So the base under any suite matters as much as the suite. You choose the sanitaryware and brassware with your supplier or showroom, and we fit it: the vanity unit, the WC, the bath or shower enclosure, set level and sealed. Taps and valves go onto pipework we have fixed firmly, never left floating behind a board.
A wetroom has no tray to hide behind. The whole floor is the shower, so the tanking and the falls are the job. We lay the falls to the drain, tank the floor and the walls as one continuous system, and only then start tiling. A level-access shower in a smaller bathroom follows the same order, on a smaller footprint.
Underfloor heating goes down after the floor is prepared and before the tiles. It keeps a tiled floor warm underfoot and helps a wetroom floor dry between uses. The tanking decides how long it lasts.

Most failed tiling we take down was fixed straight onto old plaster or painted board, with nothing waterproof behind it. The grout looked fine for years. The wall behind it did not. Our strip-out goes back to sound surfaces, and first-fix plumbing is rerouted while the walls are open, so supplies and wastes run where the new layout needs them. Then the waterproofing and tanking go on, across every wet zone, before a single tile is fixed.
Tiling is set out from the centre lines of the room, so cut tiles land at the edges and not across a window reveal or the front of the bath. Junctions between floor, wall, tray and bath get the attention. That is where water finds its way in. Homes in Staines-upon-Thames ask us for a bathroom installation in the same way that people looking for bathroom fitting services Dorking do, and the sequence is identical in both: prepare, tank, set out, tile, seal.
Lighting, shaver points, the extract fan and any heated towel rail need to be right in a wet room. Bathroom electrics and ventilation fall under The Building Regulations 2010, so we coordinate that work with the appropriate trade and schedule the inspections it needs. You deal with one project manager. The trades are arranged around them.

Two bathrooms of the same size rarely cost the same. The floor, the pipework and the walls behind the tiles are almost never in the same condition. A sound floor with the stack nearby is one job. A soft floor, a waste that has to move across the room and a bath swapped for a wetroom is another. Underfloor heating, the extent of tanking and how much wall gets tiled all move the figure too.
You get a transparent written proposal with a breakdown of costs, timelines and permits. Each stage of the work is set out, so you can see what is included before anything starts:
If you use the Bathroom Concept and Layout Service, its fee is fully deducted from the installation cost. The design work is not paid for twice. You see the breakdown before work starts.
Book a survey with Abinger Construction Ltd for your bathroom installation in Staines-upon-Thames and receive a written proposal breaking down costs, timelines and permits stage by stage.

A bathroom is the one room a household cannot go without for long, and that shapes how we run the job. A dedicated project manager is your single point of contact from the consultation to the final walkthrough. They plan the order of work, coordinate subcontractors, handle any permits needed and book the inspections. If you are searching for bathroom fitting close to home in Staines-upon-Thames, the person you speak to first is the person who stays with your job. No passing you along.
Most of our bathroom work happens in homes where people are living. Floors and stairs on the route in are protected. Dust is contained. The site is cleared and kept tidy at the end of each day, and you are told what is happening next before it happens. The timeline in your proposal is set around your household, and your project manager keeps you updated as each stage closes.
When the last silicone joint has cured, we carry out our quality inspections and then walk through the finished room with you. Every job carries a 10-year workmanship guarantee, subject to its terms and conditions. If something is not right, we come back and put it right. Book your survey, and we will start with the floor, the stack and the walls behind the tiles.
Book a survey with Abinger Construction Ltd for your bathroom installation in Staines-upon-Thames and receive a written proposal breaking down costs, timelines and permits stage by stage.

Hosted by MJ Support for all your IT needs
© 2026 All Rights Reserved Abinger Construction.