Our written testimonials come from a full house renovation, a full refurbishment and a flat renovation referred by the client’s architect, and we are reviewed on Houzz. What those jobs share is work nobody sees. Bathroom installation in Brockham starts, for us, behind the tiles.
The Essentials
We are a Surrey building company with bathrooms and wetrooms as our declared focus, and our wet room installation services Brockham run the same way: one dedicated project manager, work alongside your own architect or showroom, and a 10-year written workmanship guarantee, subject to its terms.
Ask Abinger Construction Ltd for a free quote on your Brockham bathroom and see the written proposal before anything comes out.

Take the tiles off an older bathroom and the room starts talking. Pipe runs boxed in behind plasterboard. A floor that falls toward the bath, not the waste. Grout laid over bare plaster where a shower has run for years. In period homes the walls are rarely square, and in flats the waste route is usually fixed by the soil stack below.
So we survey before we draw anything. We measure the room, note where the soil pipe and supply runs sit, check what the floor is built from, and look at how materials will come in and out of the house. Tight stairs and narrow landings change how a strip-out is planned.
If you want the layout settled first, our Bathroom Concept and Layout Service gives you a measured layout plan, a 2D floor plan and 3D visual concept images, with practical advice on layout and installation. It is a paid service, and the fee is fully deducted from the installation cost. It is a concept layout service, not a full specification of the interior design, so final product selections are made with your own supplier or showroom.
Already working with a designer or an architect? Then we build from their drawings, or from agreed layouts and product selections, and take responsibility for the build, coordination and finish. The survey decides the rest.
Book a consultation with Abinger Construction Ltd and get a written proposal for your Bathroom Installation in Brockham, with costs, timeline and permits broken down before any strip-out begins.

A wall-hung basin needs a frame or a solid wall behind it. Plasterboard alone will not hold one for long. That is why we plan fixings before anything is fitted.
You choose the sanitaryware and brassware with your own showroom or supplier. We set the frames, waste positions and valve heights around those actual products, before first-fix plumbing goes in, so nothing is guessed and nothing is moved twice.
Most of a wet room is work you never see. The floor has to fall to the drain, and the whole wet zone is tanked with a membrane, with sealing tape at every corner and pipe penetration, before a tile goes down. On a timber floor the falls are built into the deck. On a solid floor they are formed in the screed.
Get the falls wrong and water sits. Get the tanking wrong and it finds the ceiling below. Households in Westcott ask us the same questions about drains and thresholds, and our bathroom installation services Westcott follow the identical routine. Tanking and falls are the job.

A bathroom is often the only one in the house, and taking it out of use is the part that worries people most. You ring one number.
Your dedicated project manager is the single point of contact from consultation to the final walkthrough. They coordinate the subcontractors, schedule the inspections, and handle any planning applications and permits the job needs.
Before work starts you get a written proposal: costs broken down, timelines set out, permits listed. Then the sequence runs in order. Strip-out and preparation. First-fix plumbing and electrics. Waterproofing and tanking. Wall and floor tiling. Sanitaryware and brassware. Finishing and final checks. How long each stage takes depends on your room, and the proposal tells you before anything comes out.
Most of our bathroom work happens in homes people are still living in. So the site is protected, kept tidy, and you are told what happens next. From Brockham across to Dorking the approach is the same, and bathroom fitting in Dorking runs to the same sequence. No surprises, no guessing.

Most tiling failures start underneath the tile. Adhesive spot-fixed onto bare plaster. Grout carrying water into a wall that was never sealed. We tile onto a prepared, tanked substrate with full adhesive coverage, and finish the junctions neatly where wall meets floor, around the bath and at the shower tray, with silicone at the movement joints.
First-fix plumbing is set to the products you have chosen, so valves and wastes land exactly where the fittings need them. Underfloor heating is laid before the floor finish, and tested before tiling covers it. Old pipework gets dealt with, not boxed in again.
Electrical work in your bathroom is carried out by the electrician we coordinate on the job. It is scheduled around the plumbing and tiling, so nothing is chased into a finished wall. Order matters here.
Our team takes on a bathroom installation in Brockham and a basement conversion in Brockham the same way, under one project manager and across the whole area. Every job carries our 10-year workmanship guarantee, subject to terms and conditions. Ask for a free quote. If something is not right, we come back.
Book a consultation with Abinger Construction Ltd and get a written proposal for your Bathroom Installation in Brockham, with costs, timeline and permits broken down before any strip-out begins.

Hosted by MJ Support for all your IT needs
© 2026 All Rights Reserved Abinger Construction.