Our work is reviewed on Houzz, and the written testimonials on our site come from full refurbishments and a flat renovation that reached us through the owner’s architect. Bathroom Installation in Betchworth gets the same discipline in a smaller room: strip-out, tanking, tiling, then a finish we check with you.
At a Glance
We are a Surrey building company with bathrooms and wetrooms as our declared focus. One project manager runs your job from consultation to walkthrough, as on our conversions in Betchworth, and the workmanship carries a 10-year written guarantee, subject to its terms.
Ask Abinger Construction Ltd for a free Betchworth quote and you get a written proposal before a tile comes off the wall.

Every job starts with a consultation and a look at the room as it stands. We measure it, note where the soil pipe and wastes run, check what the floor is built from and see how the room is ventilated. Those four things decide where a shower can sit long before anyone talks about tiles.
If you want the plan drawn properly first, our Bathroom Concept and Layout Service gives you:
It is a paid service, and the fee is fully deducted from the installation cost. It is a concept layout service, not a full interior design specification, and your final product selections are made with your own supplier or showroom. Already working with a designer? Good. We build from agreed layouts and selections just as readily.
Ask Abinger Construction Ltd for a free Bathroom Installation quote in Betchworth and receive a written proposal breaking down costs, timelines and permits.

The sequence on site runs in a fixed order:
The order is the point. A membrane applied after the tiles is not tanking. And a junction nobody planned at preparation stays visible in the grout line for good.
In a period home the bathroom floor is often timber and rarely flat. We check it for movement before tiling, because a floor that flexes cracks grout. Older walls usually need more preparation than a newer build before they will take a board or a membrane, and we allow for that at survey rather than on the day.
Most of the bathrooms we fit are in houses people are still living in. So the site is protected, the route in stays clean and you are kept informed as each stage moves on. Flats, narrow stairs and limited parking mean deliveries and skip removal get planned before strip-out begins. If you want a bathroom fitter close to home in Betchworth, it sits well inside the part of Surrey we cover.
Ask Abinger Construction Ltd for a free Bathroom Installation quote in Betchworth and receive a written proposal breaking down costs, timelines and permits.

Three trades meet in a bathroom. Most failures happen where one hands over to the next, and one project manager owning every handover is how we stop that.
Tanking goes across the floor and up the walls in the wet zones before a tile is fixed. Tiles are then set out from the centre lines, so cuts land evenly at each edge and around the waste. The joint where floor meets wall is sealed, not grouted, because it moves. Neat junctions are what make a bathroom look finished.
First fix runs supplies and wastes to their final positions while the walls are still open. Every waste needs a steady fall to drain. Where an older house has awkward pipework or a drainage limitation, we find it at survey and design around it. Not with the floor up.
Lighting, extraction and underfloor heating are coordinated as part of the job. Electrical work goes to the right subcontractor, scheduled so it is complete before the walls close. Where part of the work falls under The Building Regulations 2010, we arrange the inspections it needs.

We do not price from a photograph. The cost depends on the size of the room, what strip-out uncovers, how much preparation the walls and floor need, whether tanking covers one shower zone or the whole room, and the suite you choose.
What you receive is a transparent written proposal, setting out:
Sanitaryware and brassware are usually bought through your own supplier or showroom, so the proposal shows our part of the job on its own lines. You can see exactly what each line covers. If preparation finds something a survey could not, such as damaged boards under an old bath, we tell you before the work moves on.

You have one dedicated project manager from consultation to final walkthrough. One person. One point of contact.
The job moves through four stages:
How long a bathroom takes depends on the room and the preparation it needs, so the timeline is set out in your proposal rather than guessed at here. Tanking has to cure before tiling, and adhesive and grout need their time. We allow for that rather than cut it. Where permits or approvals apply, we handle the applications for you.
Every job carries a 10-year workmanship guarantee, subject to its terms and conditions. If something is not right, we come back and put it right.

The suite is yours to choose, with your own supplier or showroom. Our job is to fit it so it lasts.
A wall-hung vanity unit, a freestanding bath or a framed shower enclosure all need their fixing details settled before tiling: backing in the wall for hung units, waste heights, the exact line of the enclosure. Get those right at first fix and the finish follows.
In a walk-in shower or level-access wetroom, the tanking and the falls are the whole job. The floor falls to the drain across the full shower area, the membrane runs unbroken under the floor and up the walls, and the tiles follow the falls exactly. There is no tray to hide a mistake.
That is the standard we hold every Betchworth bathroom to: careful preparation, proper waterproofing and junctions you never have to look at twice. Ask us for a free quote and your project manager will start with the survey.
Ask Abinger Construction Ltd for a free Bathroom Installation quote in Betchworth and receive a written proposal breaking down costs, timelines and permits.

Yes. Most of our bathroom work happens in occupied homes. We protect floors and the route to the room, keep the site tidy, and your project manager keeps you informed as each stage moves on. If it is your only bathroom, we talk the sequence through at consultation so you know which stages affect daily use.
Yes, and we would rather find those things at survey than with the floor up. We check how the floor is built, where wastes can fall to drain and what the walls will take, then write the preparation into the proposal. Uneven floors get levelled. Awkward pipework gets designed around.
It depends on the room, the preparation it needs and the suite you choose, so we do not give a figure without seeing it. After a survey you get a transparent written proposal breaking down costs, timelines and permits. The quote is free. If you use our concept service, its fee comes off the installation cost.

Hosted by MJ Support for all your IT needs
© 2026 All Rights Reserved Abinger Construction.